Michelin Proving Grounds

 
 

The client requested a metal building/covering to protect fuel pumps at the Michelin Proving Grounds. This meant our team performed metal building erection and the painting of the metal building.

Accessing this site was a challenge for our team, since the Michelin property is strictly controlled. This meant access for equipment, workers, etc. was a bit tough to navigate at times. The temperature was also an issue, since the paint had a minimum temperature application requirement.

Previous
Previous

AM PM Farms

Next
Next

Rocky Creek Storage